
01 · Signal
Signal detected
Yangtze Delta port congestion intensifies. Risk pulse moves to elevated.
SeverityHigh
A real disruption — detected, traced, simulated, and resolved. Five steps. One operating loop.

Each stage feeds the next, automatically — no spreadsheets, no war rooms.

Yangtze Delta port congestion intensifies. Risk pulse moves to elevated.

Path resolves to Qingdao Precision — a Tier-2 forge with no qualified backup.

Two inbound shipments to Indianapolis predicted +6 days behind schedule.

Stress test projects coverage falls below safety stock in 6 days.

Shift 35% to Hanoi Forge backup, pre-position safety stock at LA/LB.
Disruptions reaching operations
On-time delivery
Impact mitigated per year

Book a demo or create your workspace — first risk graph in 7 days.